Leica Tcr805 Total Station User Manual Work -
To establish a coordinate system, the total station must know its own position (Station) and the direction it is facing (Orientation). Step 1: Input Station Coordinates Go to MENU > . Select Set Station (F1). Enter the Station Point ID, instrument height (
Press the ALL key. The station records point number, horizontal angle, vertical angle, slope distance, and calculated 3D coordinates instantly. 5. Construction Stakeout (Setting Out)
Accesses settings to change target types (prism, tape, or reflectorless). The Sight of the Silent Sentinel
Up to 3,500 meters using a single standard round prism. leica tcr805 total station user manual work
: Upon receiving your Leica TCR805, carefully unpack all components. The standard delivery typically includes the total station unit, two rechargeable NiMH batteries (GEB111 or similar), a battery charger, an RS-232 data transfer cable, a transport case, and the user manual. Inspect everything for any signs of damage that may have occurred during transit.
Adjust the tripod leg heights to center the circular bubble vial.
: In this mode, you enter the coordinates of a point you need to mark in the field. The instrument guides you with directional and distance instructions until you reach the exact location. To establish a coordinate system, the total station
The Leica TCR805 total station serves as a bridge between traditional optical surveying and modern digital data management. Its robust design and integrated software make it particularly effective for
The Leica TCR805 is a workhorse that, when used properly, provides exceptional value for surveyors. By mastering the setup, understanding the onboard menus, and maintaining the device according to the , you can maximize productivity in the field.
Length (Fill/Cut distance). Move the rodman forward or backward until the error reads zero. 6. Data Export and PC Connectivity Enter the Station Point ID, instrument height (
Check tripod stability. Re-level using the electronic bubble. Beam path blocked or improper EDM mode selected.
Stakeout is the reverse of surveying; you are finding physical locations on the ground based on predefined design coordinates. From the main menu, navigate to > Stakeout . Ensure the station orientation is active. Enter or select the design Point ID you want to locate. The screen will display (the horizontal angle rotation required). Rotate the total station until reads 0° 00' 00" . Lock the horizontal clamp.
If you want, I can: